iNPIPE HIRE NEWS 

 

iNPIPE HIRE™ Sailing to new horizons

 

Northern Marine Power approached INPIPE HIRE™ s in December 2009 asking for the high pressure testing of some CO2 stainless steel pipework on a boat being constructed for the Ministry de la Defence of the French Republic (Delta have been contracted for 5 x 11.95m Pilot Vessels for duty with the French Navy). The boat had to be surveyed under the full Bureau Veritas classification and in accordance with Marine Marchande (MM) rules.


INPIPE HIRE™ spoke with NMP to confirm the final requirements for the project.  Northern Marine Power placed an order beginning of January to proceed with the test, to be to undertaken at their premises in Stockport.


INPIPE HIRE™ arranged to test the pipework on Thursday 14th January 2010 and undertook out a 30-minute test. The test was fully competed to Client satisfaction and all relevant certification was issued.


A Representative of Bureau Veritas, who was present to inspect build progress, witnessed the full test and inspection.

 Back to all news stories         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

website design software
website design software